Special View on a BOM – BOMs Usage

March 5, 2010 by mySAP
Filed under: Production Planning Module 


If separate BOMs are maintained for a product in different areas of your company, BOM reporting functions can be used to obtain information that is directly relevant to your requirements.

  • design BOM
  • production BOM
  • costing BOM

The design BOM includes all the components of the product and their technical data from the design point of view. This BOM is generally not linked to any order.

The production BOM includes all the items required from the production and assembly point of view. To assemble a product, you only require items that are relevant to production, which contain process data.

The costing BOM describes the product structure and is used to automatically determine the costs of the materials required for a product. Items that are not relevant to costing are not included in the costing BOM.

Each area (for example, production) creates its own BOM that contains application-specific data, instead of using one BOM for the entire company. Each area can target the BOM explosion to find only the data that is relevant. The data shown in a BOM explosion also depends on how the BOM application is defined. For example, a BOM application can define priorities for BOM usages.

Viewed 4857 times by 1456 viewers

Related SAP Topics:

Comments

Tell me what you're thinking...
and oh, if you want a pic to show with your comment, go get a gravatar!





mySAP ERP | SAP Business | SAP Tutorial | SAP Help