SAP Error Message no. 6P030

August 19, 2010 by mySAP · Leave a Comment
Filed under: SAP Knowledge, SAP Tutorial 


SAP Message no. 6P030: Requirements type XXXX does not exist

The requirements type is not defined as a strategy for the material in the strategy group.

The strategies allowed for planning a material are recorded in Customizing for demand management in the strategy group. The strategy group can either be allocated to the material in the material master record, either directly or via the MRP group. The SAP system uses the strategy group to find the correct requirements type when creating or changing planned independent requirements.

…Click here to read more

Viewed 3713 times by 936 viewers

Function of PCA in new G/L and classic PCA

Setting proposal profit centers for line items is the one of function that differences between the function of PCA in new G/L accounting and in classic PCA.

…Click here to read more

Viewed 5512 times by 1303 viewers

SHD0 – Creating Transaction and Screen Variants

How to create Transaction and Screen Variants to change screen layouts. And how to assign those transactions and screens variants to a group of users.

Transaction variants can be used to simplify transaction flow by:

  • Inserting default values for fields
  • Hiding and changing fields to read only
  • Hiding and changing the attributes of tables of control columns
  • Hiding individual menu functions
  • Hiding entire screens

And a transaction variant is made up of a series of screen variants.

…Click here to read more

Viewed 7499 times by 1883 viewers

Change Layout of MIRO Screen

For MIRO transaction, OLMRLIST transaction can be used to create screen variant.

Alternative way is, for changing any layout of the screen, “Screen Variant” have to be created or you can change the Standard Screen Variant (Basic Settings, for example)

The steps are:

…Click here to read more

Viewed 6939 times by 1549 viewers

Profit Center Accounting and New GL in SAP ERP

For release SAP ERP, the Profit Center Accounting was integrated into the new G/L accounting. The solution is as follows:

SAP delivers the ‘Profit Center‘ and the ‘Partner Profit Center‘ as fixed characteristics that are posted on the original FI postings. The data is not updated, as required, in another ledger, as in the classic Profit Center Accounting.

As a result of integration of the Profit Center Accounting into the new G/L accounting, new functions such as ‘document splitting’ are available. Using the ‘Document Splitting‘ function (online document split), balance sheets can be created for company codes as well as for other entities such as the profit center. The balance is then set to 0 for each document for the profit center.

…Click here to read more

Viewed 7853 times by 1687 viewers

BOM Is Not Exploded Issues

August 2, 2010 by mySAP · Leave a Comment
Filed under: Production Planning Module, SAP Tutorial 

A BOM is not exploded in the following situations:

  • No BOM is effective: On the explosion date and in the given area of validity, For the given effectivity parameters
  • The BOM has a deletion indicator.
  • The BOM is a multiple BOM, and has no alternative that matches the lot size for your required quantity.
  • No BOM matches the selection criteria of the BOM application you selected.

This is possible in the following situations, for example:

…Click here to read more

Viewed 7700 times by 1452 viewers

Page 3 of 5712345102030...Last »

mySAP ERP | SAP Business | SAP Tutorial | SAP Help