How are Bills of Material Used in SAP PP?

February 21, 2010 by mySAP
Filed under: Production Planning Module 


The data stored in BOMs (bills of material) serves as a basis for production planning (SAP PP)activities such as:

  • A design department (working with CAD) can base its work on bills of material. BOMs can be created in the SAP system from CAD program, via the SAP-CAD interface.
  • Material requirements planning (MRP) department explodes bills of material) on a certain date to calculate cost-effective order quantities for materials.
  • A work scheduling department uses bills of material as a basis for operation planning and production control.
  • A production order management department, uses bills of material to plan the provision of materials.

 

The data stored in BOMs is also used in other activities in a company such as:

· Sales orders: As an aid to data entry. You can also create and maintain a BOM specifically for a sales order (variant configuration).

· Reservation and goods issue: As an aid to data entry

· Product costing: To calculate the costs of materials required for a specific product

 

This simultaneous use of BOM data in different areas of a company illustrates the advantage of a system based on integrated application components. Links between application components facilitate continuous data exchange between different application areas, giving all users access to the latest data at all times.

Viewed 4129 times by 1697 viewers

Related SAP Topics:

Comments

Tell me what you're thinking...
and oh, if you want a pic to show with your comment, go get a gravatar!





mySAP ERP | SAP Business | SAP Tutorial | SAP Help