How to Always Display System Messages in ECC 6.x

March 21, 2010 by mySAP · Leave a Comment
Filed under: SAP Knowledge, SAP Tip 

We are now using SAP ECC6.0 version. The SAP system only displayed system messages that were created after the first login of user. After re-logon again by using the same SAP ID, the system messages are displayed anymore.

The system messages should be displayed everytime loging on SAP system as SAP 4.6c version.

Read more

Viewed 12206 times by 2460 viewers

Updating Department field in Material Group

March 15, 2010 by mySAP · Leave a Comment
Filed under: Production Planning Module 

Department field (T023-ABTNR) in Material Group (SAP table: T023) can be maintained by using WG22 transaction

 

Material Groups in SAP system

With material groups you group materials with the same attributes or purpose.

Material groups in SAP system can be used to:

Read more

Viewed 9635 times by 2112 viewers

Defination of the Item Status with the BOM Usage

March 14, 2010 by mySAP · Leave a Comment
Filed under: Production Planning Module 

By defining the BOM usage (Customizing for Bills of material, step Define BOM usages) in the SAP system, each company determines which item statuses can and cannot be set.

The item status covers a range of indicators that can be entered for BOM items, relevant to engineering, relevant to production, relevant to costing, and so on, for example.

 

These item status indicators control:

  • Processing of the BOM in related application areas. The indicators define whether further processing is required, allowed, or not allowed. If processing in an application area is supported, you can maintain application-specific data for the items. For example, only items that are relevant to production are copied to a production order.
  • The selection of items for BOM explosion

Read more

Viewed 7312 times by 1900 viewers

Incorrect Cost Estimate with BOM

March 11, 2010 by mySAP · Leave a Comment
Filed under: Production Planning Module 

According BOM of some assembly part, material just consume only component part 1ea. However after executing cost estimate (CK11N transaction). The result got that component 2ea.

 

The error might be caused by some value in material master. If assembly material master is updated the component scrap in percent field on MRP4 view. This makes the cost estimate increased.

 

Component scrap in percent value is also used in material requirement planning (MRP) to determine the quantities of component required. When exploding the bill of material (BOM), the SAP system will increase the required quantities of the components by calculated scrap quantity

Viewed 5388 times by 1454 viewers

Special View on a BOM – BOMs Usage

March 5, 2010 by mySAP · Leave a Comment
Filed under: Production Planning Module 

If separate BOMs are maintained for a product in different areas of your company, BOM reporting functions can be used to obtain information that is directly relevant to your requirements.

  • design BOM
  • production BOM
  • costing BOM

Read more

Viewed 4858 times by 1457 viewers

SAP PP : BOM Usage

March 2, 2010 by mySAP · 1 Comment
Filed under: Production Planning Module 

Many companies have only one universally applicable BOM structure for all areas of their company. This structure usually takes the form of complete single-level BOMs, created in the design department, and used in both material management and the assembly workshop.

 

The standard SAP system allows you to maintain individual BOMs for any area of your company. These BOMs are maintained independently of each other and are assigned different internal BOM numbers.

Read more

Viewed 4739 times by 1365 viewers

Page 2 of 21123451020...Last »

mySAP ERP | SAP Business | SAP Tutorial | SAP Help